Pine Lake Park Slope Restoration Project

Sector: Car parking • Location: San Franscisco, California, United States of America

Source: SF Water Power System

Project
Design

NOTE: The Vale Parking lot and Pine Lake Park dog meadow are open but may experience temporary closures when equipment is being brought in or out of the park. We do not expect any impact to Stern Grove summer activities.July 2024 Update:Our engineers have completed an extensive survey of the impacted area and are now in the final stages of developing a slope stabilization and restoration design. T

Project Information FAQ

Project Information

4 Q
The project “Pine Lake Park Slope Restoration Project” is an infrastructure initiative in the Car parking sector, located in San Franscisco, California, United States of America. Taiyo aggregates data on it from SF Water Power System.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

NOTE: The Vale Parking lot and Pine Lake Park dog meadow are open but may experience temporary closures when equipment is being brought in or out of the park. We do not expect any impact to Stern Grove summer activities.July 2024 Update:Our engineers have completed an extensive survey of the impacted area and are now in the final stages of developing a slope stabilization and restoration design. This design will take into account how best to support existing infrastructure at that location including both the 60-inch water transmission line and a sewer main. A contractor has been engaged and construction work on the slope will begin once the completed design has been reviewed and approved. Initial construction is expected to begin in August, 2024.Background:On March 8, 2024, an 8-inch air valve connected to a 60-inch water transmission line failed, just below the end of the 1700 block of Wawona Street, above the Pine Lake Park dog park.  That transmission line feeds water from our treatment plant on the San Francisco Peninsula to the Sunset Reservoir, which is one of the largest serving the residents of the city.Water streaming from the air valve caused a geyser above the area which then flowed down a steep slope into the park, scouring a path to the park below until the crews onsite were able to shut the leak down.The week of March 11, 2024 the SFPUC identified a construction contractor and an engineering consultant who will work with the agency to determine a scope and schedule for repairs, including the hillside and the dog park area.Map is approximate and not to scale.  Blue area is the location of the impacted slope. Yellow area is the debris field.The first phase of work to prepare for restoration of the area was to remove hazardous trees.  That included all trees that became dangerously undermined by the scouring action of the water.  This work began on March 11th and was completed on March 21st.The second phase of work involved covering the affected area of the slop with plastic sheeting to prevent further erosion. That work was completed on March 22nd.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data