Pine Road Stormwater Basin Improvements

Sector: Car parking • Location: Bremerton, Washington, United States of America

Source: City of Bremerton

Project
Prospective

Project work in upland areas is nearing completion and the Contractor is working on punch list items. Landscape areas will be seeded this fall, at which time the upland project phase will be complete. A second phase of the project to replace the failing outfall at the intersection of Sheridan Road and Lebo Boulevard is currently in design. Construction for the new outfall is planned for Summer

Project Information FAQ

Project Information

4 Q
The project “Pine Road Stormwater Basin Improvements” is an infrastructure initiative in the Car parking sector, located in Bremerton, Washington, United States of America. Taiyo aggregates data on it from City of Bremerton.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

prospective

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project work in upland areas is nearing completion and the Contractor is working on punch list items. Landscape areas will be seeded this fall, at which time the upland project phase will be complete. A second phase of the project to replace the failing outfall at the intersection of Sheridan Road and Lebo Boulevard is currently in design. Construction for the new outfall is planned for Summer 2024. Traffic Impacts: All project areas are currently open to traffic with no restrictions. SCOPE/PURPOSE This project made two substantial improvements for stormwater in East Bremerton: Olympic Manor Neighborhood – This neighborhood, in particular Dibb Street, Robin Street, and Eagle Avenue, experiences flooding caused by insufficient stormwater capacity in the system. The project corrects the flooding issue by installing new and larger pipes to increase stormwater capacity in both Robin and Eagle. Along with these system improvements, the City completed needed improvements to the downstream outfall and inlet for Stephenson Creek where these pipes connected and made roadway improvements. These improvements consist of an asphalt overlay for Eagle, complete the missing sidewalk section on the east side of Robin, and curb ramp upgrades and improving the ADA accessibility for the neighborhood. Pine Road Stormwater Outfall – The project outfall, located near the intersection of Lebo Boulevard and Sheridan Road, is a failing. The project will replace this outfall with a new one that will dissipate energy reducing beach erosion, remove concrete debris surrounding the existing, and greatly improve the beach environment

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data