Pine Valley Storm Headwall and Spillway Rehabiliations
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
Construction of an appropriate storm water management solution to mitigate erosion and sediment deposits from the storm sewer outlet located on Pine Valley Drive, at Club House Road to protect the structural integrity of the roadway. The project includes the installation of plunge pools, weirs, check dams, rip rap and energy dissipaters.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Pine Valley Storm Headwall and Spillway Rehabiliations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of an appropriate storm water management solution to mitigate erosion and sediment deposits from the storm sewer outlet located on Pine Valley Drive, at Club House Road to protect the structural integrity of the roadway. The project includes the installation of plunge pools, weirs, check dams, rip rap and energy dissipaters. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
