Piney Branch Tunnel
Sector: Tunnel • Location: Washington
Source: District of Columbia Water and Sewer Authority (DC Water)
DC Water’s Piney Branch Tunnel project involves planning a 4.2-million-gallon underground storage tunnel to capture sewage combined with stormwater, known as combined sewer overflow (CSO), that would otherwise overflow into Piney Branch and ultimately Rock Creek during heavy rains. The project aims to reduce overflow volume from CSO 049 by 96 percent in an average rainfall year when completed.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | DC Water’s Piney Branch Tunnel project involves planning a 4.2-million-gallon underground storage tunnel to capture sewage combined with stormwater, known as combined sewer overflow (CSO), that would otherwise overflow into Piney Branch and ultimately Rock Creek during heavy rains. The project aims to reduce overflow volume from CSO 049 by 96 percent in an average rainfall year when completed. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
