logo

Pingtan Comprehensive Experimental Zone high-speed railway central station

Sector: Automotive • Location: China

Source: World Bank Group

Project
Active

The comprehensive transportation hub of the high-speed railway central station of Pingtan Comprehensive Experimental Zone is a public building with a total land area of ??155,630.18 square meters (234 acres of land allocated); the total designed building area is 20,4425.6 square meters, of which: the total floor area of ??the ground is 140,484.91 The square meter has a total underground constructi

Status
Prospective
Sector
Automotive, Mass Transit, Car parking, Commercial, Rail, Road, Government, Hotel
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Pingtan Comprehensive Experimental Zone high-speed railway central station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pingtan Comprehensive Experimental Zone high-speed railway central station” is an infrastructure initiative in the Automotive sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The comprehensive transportation hub of the high-speed railway central station of Pingtan Comprehensive Experimental Zone is a public building with a total land area of ??155,630.18 square meters (234 acres of land allocated); the total designed building area is 20,4425.6 square meters, of which: the total floor area of ??the ground is 140,484.91 The square meter has a total underground construction area of ??63,940.69 square meters. Construction projects include long-distance passenger station, rural passenger station, taxi storage and boarding area, Pingtan tourist service center, bus station, exhibition center, hub supporting room, underground parking garage, underground non-motor vehicle garage, high-speed rail station Car lanes and lanes, parking areas connected to the high-speed rail station, lanes and some pedestrian areas. (2) Qilin Avenue (Changxing Road - Yaozhu Road), Station North Ring Road (Station 7 Road - Heping Avenue), Station South Ring Road (Station 7 Road - Heping Avenue), Yaozhu Road (Station North Road - Station South Road) The total length is 4048.153 meters. SPV is China Railway (Pingtan) High-speed Railway Center Station Transportation Hub Management Co., Ltd., a JV between the sponsors China Railway First Bureau Group Co., Ltd. (35%), China Railway Capital Co., Ltd. (40%) and the state-owned Pingtan Comprehensive Experimental Zone Transportation Investment Group Co., Ltd. (25%). Type of concession is BOT with a contract period of 22 years. Financial close took place on February 28, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=b233c8799463466197ff4f93dca5f0a9

Original sector

Transport

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Automotive, Mass Transit, Car parking, Commercial, Rail, Road, Government, Hotel

Article published date

2024-05-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project