logo

Pink line of Bangkok mass rapid transit (MRT) system

Sector: Commercial • Location: Sara Buri, Thailand

Source: World Bank Group

Project
Active

The project involves the construction and operation of the 34.5 KM Pink Line of the mass rapid transit (MRT) system between Min Buri district (Bangkok) and Khae Rai (Nonthaburi province). It will connect with existing MRT lines such as Purple and Green Lines, and new MRT lines such as Red and Orange Lines. The project includes also 30 stations, 1 depot and stabling yard, 1 one park & ride building

Status
Prospective
Sector
Commercial, Mass Transit, Car parking, Consumer Products, Government, Power Generation (CCGT), Rail, Automotive
Location
Sara Buri, Thailand
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Pink line of Bangkok mass rapid transit (MRT) system

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pink line of Bangkok mass rapid transit (MRT) system” is an infrastructure initiative in the Commercial sector, located in Sara Buri, Thailand. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the construction and operation of the 34.5 KM Pink Line of the mass rapid transit (MRT) system between Min Buri district (Bangkok) and Khae Rai (Nonthaburi province). It will connect with existing MRT lines such as Purple and Green Lines, and new MRT lines such as Red and Orange Lines. The project includes also 30 stations, 1 depot and stabling yard, 1 one park & ride building. The Pink Line project runs alongside the Yellow Line project. The project SPV is Northern Bangkok Monorail Company Limited (NBM). The sponsors are BTS Group Holdings Plc (75%), Ratchaburi Electricity Generating Holding Plc (10%) and Sino-Thai Engineering and Construction Plc (15%). The SPV submitted the most competitive offer and was selected as the preferred bidder in December 2016. The 33-year concession agreements with Mass Rapid Transit Authority of Thailand (MRTA) were signed in June 2017. NBM will have the rights to operate the line, and receive farebox revenues, commercial development fees, and parking fees. Commercial operations are expected to commence in 2021. The project cost is around THB 53.5 billion ($ 1.7 billion). Asian Development Bank (ADB) committed THB 4.95 billion or $ 157.36 million loan. Other banks included in the project are Bankgkok Bank, Krung Thai Bank and Siam Commercial Bank. The government will provide THB 22.5 billion or $ 715.26 million subsidies during the first 10 years of the operation in equal instalments. Financial close was announced on 4 June 2019. https://www.adb.org/news/adb-private-sector-financing-supports-two-new-bangkok-metro-lines

Original sector

Transport

Procurement method

Budget

Location

Country

Thailand

State

Sara Buri

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Mass Transit, Car parking, Consumer Products, Government, Power Generation (CCGT), Rail, Automotive

Article published date

2024-05-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project