Pinnacle Wind Farm, Keyser, West Virginia
Sector: Power Generation (CCGT) • Location: United States
Source: Bechtel
Pinnacle Wind Farm,Providing clean and reliable energy for the future The Pinnacle Wind Farm project extended the operating life of Clearway Energy Group’s wind farm, helping to provide clean and reliable energy for years to come. The Bechtel-Reed & Reed joint venture was contracted to design and construct the replacement of the existing wind turbine generators for more efficient wind turbine gene
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Pinnacle Wind Farm,Providing clean and reliable energy for the future The Pinnacle Wind Farm project extended the operating life of Clearway Energy Group’s wind farm, helping to provide clean and reliable energy for years to come. The Bechtel-Reed & Reed joint venture was contracted to design and construct the replacement of the existing wind turbine generators for more efficient wind turbine generators. The companies expanded the existing foundations and recycled 23 2.4 MW wind turbine generators. At the peak of demolition, four tower components were removed daily. The project recycled approximately 7,000 gross tons of steel and 800 gross tons of fiberglass. Challenging terrain The project team installed 23 new 2.4 MW wind turbine generators across three miles atop of the ridge in Mineral County, WV. The steep terrain is ideal for wind conditions but challenging for the installation of wind turbines measuring 269 feet (or 82 meters) in height. Completing a re-power project with existing end users required close coordination with many trades to ensure the tight project schedule was executed effectively and worker safety was maintained as a priority throughout the life of the project. Within four months of mobilization, the project team successfully complete the demolition sequencing so that it would not interfere with the foundation modifications required to meet deadlines for the delivery of the wind turbines components. The wind farm generates enough clean energy to power 14,000 households, offsetting 128,625 tons of carbon dioxide emissions (CO2) a year. The repowering of Pinnacle Wind Turbines increased generation capacity by 16%. Wind technology for tomorrow The completion of this project in November 2021 marked the first wind power project for Bechtel’s Clean Energy and Renewables business line. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
