Pioneer ES & Lee Anderson Ed Cntr Bldg Rehab at Merced
Gc bidding · California · Last reported Aug 2025
Source: Dodge
New Modular Classroom Building (s) for Pioneer Elementary School (Merced) & Lee Anderson Education Center (Atwater). Fabricate, transport and install a 2,400 sf, modular building, concrete slab-on-grade, single slope roof, with standing seam metal roofing, moment frame structure, utilizing a 15'x32.5' module. The building must have a DSA approved PC, 7 feet overhang at the front with 2' overhangs
- Status
- Prospective
- Sector
- Cement, Government, Metal, Education, Power Transmission, Manufacturing (Industrial), Commercial, Power Generation (CCGT)
- Location
- Merced, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Pioneer ES & Lee Anderson Ed Cntr Bldg Rehab at Merced
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New Modular Classroom Building (s) for Pioneer Elementary School (Merced) & Lee Anderson Education Center (Atwater). Fabricate, transport and install a 2,400 sf, modular building, concrete slab-on-grade, single slope roof, with standing seam metal roofing, moment frame structure, utilizing a 15'x32.5' module. The building must have a DSA approved PC, 7 feet overhang at the front with 2' overhangs at the back of the building with 2' overhangs at the sidewalls, hollow metal doors and windows, t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Merced |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Metal, Education, Power Transmission, Manufacturing (Industrial), Commercial, Power Generation (CCGT) |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
