logo

Pioneer Park Lift Station Improvements

Sector: Water Supply and Storage • Location: Brandon, South Dakota, United States of America

Source: Dodge

Project
Closed

This project consists of the reconstruction of the Pioneer Park Lift Station. The work includes replacement of the dry pit lift station with a wet pit lift station including pre-cast concrete wet well and valve vault, connect to existing force main and existing gravity sewer, Control Building, grading, asphalt paving, site restoration and related electrical and control work.

Status
Closed
Sector
Water Supply and Storage, Road, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Car parking, Automotive, Government, Cement
Location
Brandon, South Dakota, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Pioneer Park Lift Station Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pioneer Park Lift Station Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Brandon, South Dakota, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of the reconstruction of the Pioneer Park Lift Station. The work includes replacement of the dry pit lift station with a wet pit lift station including pre-cast concrete wet well and valve vault, connect to existing force main and existing gravity sewer, Control Building, grading, asphalt paving, site restoration and related electrical and control work.

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Dakota

City

Brandon

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Power Generation (CCGT), Commercial, Waste Processing and Treatment, Car parking, Automotive, Government, Cement

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project