Pioneer Trail Bridge Replacement
Sector: Metal • Location: Ravenna, Ohio, United States of America
Source: Dodge
This Project will include the improvement of 0.05 Miles of Pioneer Trail in the City of Aurora by the replacement of an existing twin corrugated metal plate culvert over the Aurora Branch of the Chagrin River with a new single span, precast box structure, including minimal approach work. The structure will maintain the same horizontal and vertical alignment. Construction Inspection and Constructio
- Status
- Closed
- Sector
- Metal, Mass Transit, Bridge, Commercial, Government, Rail
- Location
- Ravenna, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Pioneer Trail Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Project will include the improvement of 0.05 Miles of Pioneer Trail in the City of Aurora by the replacement of an existing twin corrugated metal plate culvert over the Aurora Branch of the Chagrin River with a new single span, precast box structure, including minimal approach work. The structure will maintain the same horizontal and vertical alignment. Construction Inspection and Construction Administration services for the Pioneer Trail Bridge in Portage County with improvement of 0.05... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Ravenna |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Mass Transit, Bridge, Commercial, Government, Rail |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
