Pioneer Trail Roundabout Construction
Sector: Water Supply and Storage • Location: South Lake Tahoe, California, United States of America
Source: Dodge USA
The Project is located along U.S. Highway 50/ State Route 89 at the Pioneer Trail intersection in the community of Meyers, in South Lake Tahoe, in eastern El Dorado County. The Work to be done is shown on the Plans, and generally consists of, but is not limited to: Convert the existing signalized intersection to a modern roundabout. Other items or details not mentioned above, that are required by
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Rail, Mass Transit, Commercial, Car parking, Road, Waste Processing and Treatment, Automotive
- Location
- South Lake Tahoe, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pioneer Trail Roundabout Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project is located along U.S. Highway 50/ State Route 89 at the Pioneer Trail intersection in the community of Meyers, in South Lake Tahoe, in eastern El Dorado County. The Work to be done is shown on the Plans, and generally consists of, but is not limited to: Convert the existing signalized intersection to a modern roundabout. Other items or details not mentioned above, that are required by the plans, Standard Plans, Standard Specifications, or these Special Provisions must be performed... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | South Lake Tahoe |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Rail, Mass Transit, Commercial, Car parking, Road, Waste Processing and Treatment, Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
