Pioneiros II Thermal Power Plant
Sector: Commercial • Location: Brazil
Source: World Bank Group
The company Brazilian company Pioneiros Bioenergia S.A. was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Sao Paulo (50 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in December 2007. The sponsor created a special purpose company named Pioneiros Termoeletrica Ilha Solteira S.A. to manage the
- Status
- Prospective
- Sector
- Commercial, Geothermal, Power Generation (CCGT), Steel, Government, Biomass, Manufacturing (Industrial)
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Pioneiros II Thermal Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The company Brazilian company Pioneiros Bioenergia S.A. was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Sao Paulo (50 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in December 2007. The sponsor created a special purpose company named Pioneiros Termoeletrica Ilha Solteira S.A. to manage the project. The value of the investment committed to the project was estimated in US$ 6.2 million (BRL 12.2 million). In March 2007, the company had taken part in a competitive bidding process and had won the right to supply electricity for 30 years in the regulated market starting in 2010 (the company won the bidding by offering a tariff of US$ 71.3/MWh or BRL 139.12/MWh). The project suffered with delays and the construction works were only concluded early in 2012. As of October 2012, the power plant could not commence commercial operations because the construction works on the transmission line connecting the power plant to the national grid was not concluded. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. Commercial operations commenced in September 2013. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Geothermal, Power Generation (CCGT), Steel, Government, Biomass, Manufacturing (Industrial) |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
