logo

Pioneiros II Thermal Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

The company Brazilian company Pioneiros Bioenergia S.A. was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Sao Paulo (50 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in December 2007. The sponsor created a special purpose company named Pioneiros Termoeletrica Ilha Solteira S.A. to manage the

Status
Prospective
Sector
Commercial, Geothermal, Power Generation (CCGT), Steel, Government, Biomass, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Pioneiros II Thermal Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pioneiros II Thermal Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The company Brazilian company Pioneiros Bioenergia S.A. was granted the authorization to build and operate a sugar-cane-residue fueled power plant located in the state of Sao Paulo (50 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in December 2007. The sponsor created a special purpose company named Pioneiros Termoeletrica Ilha Solteira S.A. to manage the project. The value of the investment committed to the project was estimated in US$ 6.2 million (BRL 12.2 million). In March 2007, the company had taken part in a competitive bidding process and had won the right to supply electricity for 30 years in the regulated market starting in 2010 (the company won the bidding by offering a tariff of US$ 71.3/MWh or BRL 139.12/MWh). The project suffered with delays and the construction works were only concluded early in 2012. As of October 2012, the power plant could not commence commercial operations because the construction works on the transmission line connecting the power plant to the national grid was not concluded. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. Commercial operations commenced in September 2013.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Geothermal, Power Generation (CCGT), Steel, Government, Biomass, Manufacturing (Industrial)

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project