Pipe Culverts
Sector: Water Supply and Storage • Location: Garner, Iowa, United States of America
Source: Dodge USA
1.00 LUMP SUM CONSTRUCTION SURVEY 120.00 LINEAR FOOT CULVERT PIPE 50.00 LINEAR FOOT CULVERT, PRECAST 379.10 SQUARE YARD ENGINEERING FABRIC 34.00 CUBIC YARD EXCAVATION CLASS 10 82.40 CUBIC YARD EXCAVATION CLASS 20 4.00 CUBIC YARD EXCAVATION CLASS 21 78.40 TON GRANULAR BACKFILL 244.40 TON REVETMENT 1,900.50 TON SPECIAL BACKFILL 137.20 TON SURFACING, CRUSHED STONE 237.00 CUBIC YARD TOPSOIL, STRIP/SAL
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | 1.00 LUMP SUM CONSTRUCTION SURVEY 120.00 LINEAR FOOT CULVERT PIPE 50.00 LINEAR FOOT CULVERT, PRECAST 379.10 SQUARE YARD ENGINEERING FABRIC 34.00 CUBIC YARD EXCAVATION CLASS 10 82.40 CUBIC YARD EXCAVATION CLASS 20 4.00 CUBIC YARD EXCAVATION CLASS 21 78.40 TON GRANULAR BACKFILL 244.40 TON REVETMENT 1,900.50 TON SPECIAL BACKFILL 137.20 TON SURFACING, CRUSHED STONE 237.00 CUBIC YARD TOPSOIL, STRIP/SALVAGE/SPREAD |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
