logo
ProjectPre-Design

Pipeline 5 Relining and Oceanside 5 Flow Control Facility

One of 10,000+ projects Taiyo tracks in California.

Source: Dodge USA

The project will rehabilitate a total of 4,789 feet of 96-inch prestressed concrete cylinder pipe using steel liners. This project will also include installation of an Isolation Facility for Pipeline 5 near the Oceanside 5 Flow Control Facility turnout. The isolation facility is housed in an underground reinforced concrete structure.

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial, Cement, Government, Steel, Metal
Location
San Marcos, California, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Pipeline 5 Relining and Oceanside 5 Flow Control Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Pipeline 5 Relining and Oceanside 5 Flow Control Facility” is an infrastructure initiative in the Water Supply and Storage sector, located in San Marcos, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project will rehabilitate a total of 4,789 feet of 96-inch prestressed concrete cylinder pipe using steel liners. This project will also include installation of an Isolation Facility for Pipeline 5 near the Oceanside 5 Flow Control Facility turnout. The isolation facility is housed in an underground reinforced concrete structure.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

San Marcos

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial, Cement, Government, Steel, Metal

Article published date

2024-10-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project