PipeLine Construction
Sector: Water Supply and Storage • Location: El Cajon, California, United States of America
Source: Dodge USA
The county of San Diego has a future widening project on Bradley Avenue where the poor geologic conditions within the road are requiring the county to remove and replace the top three feet of the road section, which puts their construction in conflict with our existing facilities. This project will replace in place approximately 4,000 feet of 6 and 8-inch AC pipe with 8-inch PVC at approximately 5
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment
- Location
- El Cajon, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about PipeLine Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The county of San Diego has a future widening project on Bradley Avenue where the poor geologic conditions within the road are requiring the county to remove and replace the top three feet of the road section, which puts their construction in conflict with our existing facilities. This project will replace in place approximately 4,000 feet of 6 and 8-inch AC pipe with 8-inch PVC at approximately 5-feet to top of pipe. Additionally, the total footage includes 18 lowering s for existing and fut... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | El Cajon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
