Pipeline from Zanyao Reservoir to Industrial Park in Zunhua City

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

The project entails the building of a double-row pipeline with a diameter of 800 mm. The length of the pipeline is 10.062 km. The water supply method of gravity gravity water supply is adopted, and the water supply scale is 60,000 cubic meters per day. The pipeline path starts from the water discharge hole of the Prajna Reservoir, and the pipeline is buried along the Shahe River. The SPV is Zunhua

Status
Prospective
Sector
Commercial, Water Supply and Storage, Car parking, Manufacturing (Industrial), Power Transmission, Government, Automotive, Power Generation (CCGT), Waste Processing and Treatment
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Pipeline from Zanyao Reservoir to Industrial Park in Zunhua City

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pipeline from Zanyao Reservoir to Industrial Park in Zunhua City” is an infrastructure initiative in the Commercial sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the building of a double-row pipeline with a diameter of 800 mm. The length of the pipeline is 10.062 km. The water supply method of gravity gravity water supply is adopted, and the water supply scale is 60,000 cubic meters per day. The pipeline path starts from the water discharge hole of the Prajna Reservoir, and the pipeline is buried along the Shahe River. The SPV is Zunhua Gangyuan Engineering Construction Co., Ltd., a wholly owned subsidiary of the sponsor Beijing Jiu'an Investment Construction Group Co., Ltd. Total project cost is $ 10.79 million. The BOT concession has a duration of 21 years. Financial close took place on November 15, 2018. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=34f5ea743b6546b4ba0a37698e52c935

Original sector

Water and sewerage

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Car parking, Manufacturing (Industrial), Power Transmission, Government, Automotive, Power Generation (CCGT), Waste Processing and Treatment

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project