Pipeline Removal
Sector: Power Transmission • Location: Hankamer, Texas, United States of America
Source: Dodge USA
Work to be performed by the Contractor shall generally be as follows: a) Contractor shall perform coordination with Texas One-Call excavation safety and underground facility damage prevention notification system. b) Contractor shall provide a written hot-tap and removal plan to Owner for review and approval prior to mobilization. Plan shall utilize Best Management Practices (BMPs) to prevent possi
- Status
- Prospective
- Sector
- Power Transmission, Water Supply and Storage, Government, Tunnel, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Hankamer, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pipeline Removal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work to be performed by the Contractor shall generally be as follows: a) Contractor shall perform coordination with Texas One-Call excavation safety and underground facility damage prevention notification system. b) Contractor shall provide a written hot-tap and removal plan to Owner for review and approval prior to mobilization. Plan shall utilize Best Management Practices (BMPs) to prevent possible residue in pipelines from contaminating LNVA rights of way or waterways. c) Contractor shall ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Hankamer |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Water Supply and Storage, Government, Tunnel, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
