Pipeline Replacement Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The major work consists of installation of approximately 2.5 miles of irrigation/water pipeline at 9 separate locations (4 main bid and 5 alternate bid), ranging in size from 24" down to 4" PVC, including all necessary valves, fittings, connections to irrigation and hydrant laterals, and approximately 4000 square feet of roadway and driveway reconstruction.
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Road, Government, Manufacturing (Industrial)
- Location
- Lindsay, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pipeline Replacement Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The major work consists of installation of approximately 2.5 miles of irrigation/water pipeline at 9 separate locations (4 main bid and 5 alternate bid), ranging in size from 24" down to 4" PVC, including all necessary valves, fittings, connections to irrigation and hydrant laterals, and approximately 4000 square feet of roadway and driveway reconstruction. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Lindsay |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Road, Government, Manufacturing (Industrial) |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
