Pipeline Replacement
Sector: Water Supply and Storage • Location: Afton, Wyoming, United States of America
Source: Dodge USA
Replace the final 2,050 LF of 16-inch steel pipe on Lateral L-20 and 475 LF of pipe on Lateral L-7 north of the main PRV. These two laterals are adjacent to each other and considered one project by the WWDO. Project also includes appurtenances such as valves, irrigation risers, cathodic protection, drains and air vacs.
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Government, Steel, Waste Processing and Treatment, Metal
- Location
- Afton, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Pipeline Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replace the final 2,050 LF of 16-inch steel pipe on Lateral L-20 and 475 LF of pipe on Lateral L-7 north of the main PRV. These two laterals are adjacent to each other and considered one project by the WWDO. Project also includes appurtenances such as valves, irrigation risers, cathodic protection, drains and air vacs. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Afton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Steel, Waste Processing and Treatment, Metal |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
