Pipoca Small Power Plant
Sector: Hydro • Location: Brazil
Source: World Bank Group
The Brazilian company HP2 S.A. was granted an authorization to build and operate a 20-MW small hydro power plant located in the Manhuacu River, state of Minas Gerais (between the municipalities of Pocrane and Alvarenga).
The 30-year contract was signed with the regulatory agency ANEEL in September 2001. In 2006, the sponsors created the special purpose company Hidreletrica Pipoca S.A. to lead
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Government, Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Pipoca Small Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Brazilian company HP2 S.A. was granted an authorization to build and operate a 20-MW small hydro power plant located in the Manhuacu River, state of Minas Gerais (between the municipalities of Pocrane and Alvarenga). The 30-year contract was signed with the regulatory agency ANEEL in September 2001. In 2006, the sponsors created the special purpose company Hidreletrica Pipoca S.A. to lead the project due to the law forbidding a single company to operate in the generation and distribution segments simultaneously. As of 2009, state-owned company Cemig held a 49% stake in this company, while Omega Energia Renovavel held 51% of the shares. Hidreletrica Pipoca S.A. committed to invest US$ 57.5 million (BRL 115 million) in the construction of PCH Pipoca. Financial closure for the project was reached in 2009, when the company was granted a US$ 41.7 million (BRL 83.4 million) syndicated loan by the state owned bank BNDES (resources would be released from Banco Itau BBA S.A. and Banco do Brasil S.A.) The remaining cost was set to be financed with the sponsors’ internal resources. The power plant became operational in October 2010. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-09-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Foz do Chapeco Hydroelectric Power Plant
- Atiaia Energia S.A.
