logo

Pipoca Small Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company HP2 S.A. was granted an authorization to build and operate a 20-MW small hydro power plant located in the Manhuacu River, state of Minas Gerais (between the municipalities of Pocrane and Alvarenga).

The 30-year contract was signed with the regulatory agency ANEEL in September 2001. In 2006, the sponsors created the special purpose company Hidreletrica Pipoca S.A. to lead

Project Information FAQ

Project Information

5 Q
The project “Pipoca Small Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company HP2 S.A. was granted an authorization to build and operate a 20-MW small hydro power plant located in the Manhuacu River, state of Minas Gerais (between the municipalities of Pocrane and Alvarenga). The 30-year contract was signed with the regulatory agency ANEEL in September 2001. In 2006, the sponsors created the special purpose company Hidreletrica Pipoca S.A. to lead the project due to the law forbidding a single company to operate in the generation and distribution segments simultaneously. As of 2009, state-owned company Cemig held a 49% stake in this company, while Omega Energia Renovavel held 51% of the shares. Hidreletrica Pipoca S.A. committed to invest US$ 57.5 million (BRL 115 million) in the construction of PCH Pipoca. Financial closure for the project was reached in 2009, when the company was granted a US$ 41.7 million (BRL 83.4 million) syndicated loan by the state owned bank BNDES (resources would be released from Banco Itau BBA S.A. and Banco do Brasil S.A.) The remaining cost was set to be financed with the sponsors’ internal resources. The power plant became operational in October 2010.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data