logo

Pipoca Small Power Plant

Sector: Hydro • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company HP2 S.A. was granted an authorization to build and operate a 20-MW small hydro power plant located in the Manhuacu River, state of Minas Gerais (between the municipalities of Pocrane and Alvarenga).

The 30-year contract was signed with the regulatory agency ANEEL in September 2001. In 2006, the sponsors created the special purpose company Hidreletrica Pipoca S.A. to lead

Status
Prospective
Sector
Hydro, Power Generation (CCGT), Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Pipoca Small Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pipoca Small Power Plant” is an infrastructure initiative in the Hydro sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company HP2 S.A. was granted an authorization to build and operate a 20-MW small hydro power plant located in the Manhuacu River, state of Minas Gerais (between the municipalities of Pocrane and Alvarenga). The 30-year contract was signed with the regulatory agency ANEEL in September 2001. In 2006, the sponsors created the special purpose company Hidreletrica Pipoca S.A. to lead the project due to the law forbidding a single company to operate in the generation and distribution segments simultaneously. As of 2009, state-owned company Cemig held a 49% stake in this company, while Omega Energia Renovavel held 51% of the shares. Hidreletrica Pipoca S.A. committed to invest US$ 57.5 million (BRL 115 million) in the construction of PCH Pipoca. Financial closure for the project was reached in 2009, when the company was granted a US$ 41.7 million (BRL 83.4 million) syndicated loan by the state owned bank BNDES (resources would be released from Banco Itau BBA S.A. and Banco do Brasil S.A.) The remaining cost was set to be financed with the sponsors’ internal resources. The power plant became operational in October 2010.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project