Pirai River Water Quality Mgmt Con.study
The status, timeline and source of this project. A free account opens every field.
Source: Inter-American Development Bank (IADB)
The objective of the proposed project is to provide the Prefectura of Santa Cruz with the technology and knowledge necessary for the analysis and management of the current and future contamination problems in the Rio Pirai basin, generating in this way the optimal conditions for planning approaches for minimizing contamination of the river. Specifically, the project will develop an overall pilot-s
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Bolivia
- Updated
- 22 Jul 2026
- Source
- Inter-American Development Bank (IADB)
ConstructChat
Ask ConstructChat about Pirai River Water Quality Mgmt Con.study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of the proposed project is to provide the Prefectura of Santa Cruz with the technology and knowledge necessary for the analysis and management of the current and future contamination problems in the Rio Pirai basin, generating in this way the optimal conditions for planning approaches for minimizing contamination of the river. Specifically, the project will develop an overall pilot-scale mathematical model of the river basin, using existing data and data to be collected in the field, to depict the hydrology and water quality of the river basin. The model will enable the understanding of the existing situation, will be able to predict future conditions, and will allow for the evaluation of various scenarios for the control of pollution. |
Original sector | ENVIRONMENT AND NATURAL DISASTERS |
Budget |
Location
Country | Bolivia |
Source
Source | Inter-American Development Bank (IADB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Bolivia
- Cochabamba Water and Sewer System
- Incahuasi Gas and Condensate Field
- Aguas del Illimani SA
- BOLIVIA MI AGUA WATER AND SANITATION
- Hidroelectrica Boliviana (Central Taquesi)
- National Irrigation Program with a Watershed Approach
- Small Population Drinking Water
- Local Strengthening for Ecosan Facilities Use in Bolivia
