Pirapora II Wind Farm
Sector: Solar • Location: Brazil
Source: World Bank Group
The project entails the construction of Pirapora II Wind Farm, part of Pirapora Phase II Wind Complex in Minas Gerais, Brazil. SPV is PIRAPORA II ENERGIAS RENOVAVEIS S.A., a subsidiary of Omega Energia Renovavel (50 %) and EDF Energies Nouvelles SA (50 %). The sponsors covers $ 20.02 million of the total cost while the rest is provided as bond financing issued by BNDES ($ 32.88 million). The proje
- Status
- Prospective
- Sector
- Solar, Cable car, Wind, Raw Materials, Telecommunications, Power Generation (CCGT), Government, Automotive, Commercial
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Pirapora II Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction of Pirapora II Wind Farm, part of Pirapora Phase II Wind Complex in Minas Gerais, Brazil. SPV is PIRAPORA II ENERGIAS RENOVAVEIS S.A., a subsidiary of Omega Energia Renovavel (50 %) and EDF Energies Nouvelles SA (50 %). The sponsors covers $ 20.02 million of the total cost while the rest is provided as bond financing issued by BNDES ($ 32.88 million). The project was awarded a 20 years PPA back in 2014 with Agencia Nacional de Energia Eletrica, a Brazilian government entity. Financial close took place on November 2, 2018. http://www.aneel.gov.br/documents/655816/15001369/ESCALADA+SET+2016/7c222f99-c558-4e14-b383-08249952087e https://ijglobal.com/articles/136711/pirapora-pv-complex-reaches-fc-in-brazil https://www.edf-renouvelables.com/en/project/pirapora-1-3/ |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Solar, Cable car, Wind, Raw Materials, Telecommunications, Power Generation (CCGT), Government, Automotive, Commercial |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
