logo

Pirpainti Ultra Super Critical Thermal Power Project

Sector: Power Generation (CCGT) • Location: Bhagalpur, Bihar, India

Source: HDFC Sky

Project
Planned

Adani Power Limited has signed a 25-year Power Supply Agreement with Bihar State Power Generation Company Ltd. to construct a 2,400 MW ultra super critical thermal power plant in Bhagalpur, Bihar. The project involves an investment of about $3 billion (₹25,000 crore) to build the Pirpainti plant consisting of 3 units of 800 MW each. It will be developed under the Design, Build, Finance, Own, and O

Status
Prospective
Sector
Power Generation (CCGT), Geothermal
Location
Bhagalpur, Bihar, India
Updated
22 Jul 2026
Source
HDFC Sky

ConstructChat

Ask ConstructChat about Pirpainti Ultra Super Critical Thermal Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Pirpainti Ultra Super Critical Thermal Power Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Bhagalpur, Bihar, India. Taiyo aggregates data on it from HDFC Sky.

Participants

Company

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Adani Power Limited has signed a 25-year Power Supply Agreement with Bihar State Power Generation Company Ltd. to construct a 2,400 MW ultra super critical thermal power plant in Bhagalpur, Bihar. The project involves an investment of about $3 billion (₹25,000 crore) to build the Pirpainti plant consisting of 3 units of 800 MW each. It will be developed under the Design, Build, Finance, Own, and Operate (DBFOO) model and is expected to generate significant employment during construction and operation.

Original sector

Energy

Procurement method

Budget

Location

Country

India

State

Bihar

City

Bhagalpur

Source

Source

HDFC Sky

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Geothermal

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project