logo
ProjectPlanned

PJM Interconnection Cycle 1 New Generation Projects

One of 10,000+ projects Taiyo tracks in Maryland.

Source: Inside Climate News

PJM Interconnection reopened its interconnection queue with 811 new generation projects applying to connect to the grid, totaling 220 gigawatts of electricity capacity. The projects include natural gas, storage, solar, and wind, reflecting a shift from a renewable-dominated queue to one with significant fossil fuel and nuclear capacity. The reformed interconnection process studies projects in clus

Status
Prospective
Sector
Natural Gas, Wind, Power Generation (CCGT), Solar, Nuclear
Location
Baltimore, Maryland, United States of America
Updated
22 Jul 2026
Source
Inside Climate News

ConstructChat

Ask ConstructChat about PJM Interconnection Cycle 1 New Generation Projects

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “PJM Interconnection Cycle 1 New Generation Projects” is an infrastructure initiative in the Natural Gas sector, located in Baltimore, Maryland, United States. Taiyo aggregates data on it from Inside Climate News.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

PJM Interconnection reopened its interconnection queue with 811 new generation projects applying to connect to the grid, totaling 220 gigawatts of electricity capacity. The projects include natural gas, storage, solar, and wind, reflecting a shift from a renewable-dominated queue to one with significant fossil fuel and nuclear capacity. The reformed interconnection process studies projects in clusters and aims to screen out speculative projects.

Original sector

Energy

Location

Country

United States of America (USA)

State

Maryland

City

Baltimore

Source

Source

Inside Climate News

URL

More Details

Record type

Project

Sector

Natural Gas, Wind, Power Generation (CCGT), Solar, Nuclear

Article published date

2026-05-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project