logo
ProjectPlanned

PJM Long-Term Load Forecast

Sector: Power Generation (CCGT) • Location: United States

Source: Dominion Post

PJM Interconnection forecasts significant growth in electricity demand over the next 20 years, estimating a peak summer demand increase from 154,144 MW in 2025 to 228,544 MW by 2045. This growth is driven by factors such as the rise of data centers and the retirement of thermal power plants.

Status
Prospective
Sector
Power Generation (CCGT), Geothermal
Location
United States of America
Updated
22 Jul 2026
Source
Dominion Post

ConstructChat

Ask ConstructChat about PJM Long-Term Load Forecast

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “PJM Long-Term Load Forecast” is an infrastructure initiative in the Power Generation (CCGT) sector, located in United States. Taiyo aggregates data on it from Dominion Post.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

PJM Interconnection forecasts significant growth in electricity demand over the next 20 years, estimating a peak summer demand increase from 154,144 MW in 2025 to 228,544 MW by 2045. This growth is driven by factors such as the rise of data centers and the retirement of thermal power plants.

Original sector

Energy

Location

Country

United States of America (USA)

Source

Source

Dominion Post

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Geothermal

Article published date

2025-02-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project