logo

PJM Power Grid Electrification and Capacity Expansion

Sector: Advanced Electronics • Location: United States

Source: The Black Chronicle

Project
Planned

The PJM power grid is facing a transition with rising electricity demand projected to increase by 25% by 2030 and up to 78% by 2050. The project involves investments in new generation capacity, efficiency, and infrastructure to meet the growing demand driven by data centers, building electrification, semiconductor manufacturing, and electric vehicles. The plan includes adding roughly 80 GW of new

Project Information FAQ

Project Information

3 Q
The project “PJM Power Grid Electrification and Capacity Expansion” is an infrastructure initiative in the Advanced Electronics sector, located in United States. Taiyo aggregates data on it from The Black Chronicle.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The PJM power grid is facing a transition with rising electricity demand projected to increase by 25% by 2030 and up to 78% by 2050. The project involves investments in new generation capacity, efficiency, and infrastructure to meet the growing demand driven by data centers, building electrification, semiconductor manufacturing, and electric vehicles. The plan includes adding roughly 80 GW of new capacity annually, deploying demand-side management programs, behind-the-meter resources like rooftop solar and battery storage, and utility-scale projects including renewables, energy storage, natural gas, and nuclear power. Infrastructure upgrades such as dynamic line rating sensors on transmission lines are also proposed to maximize grid performance.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data