logo

PK-Sindh Barrages Improvement Project

Sector: Water Supply and Storage • Location: Pakistan

Source: World Bank Group

Project
Active

The objectives of the Sindh Barrages Improvement Project for Pakistan are to improve the reliability and safety of the Guddu barrage and strengthen the Sindh Irrigation Department’s capacity to operate and manage the barrage. There are three components to the project, the first component being rehabilitation of the Guddu barrage. This component will support rehabilitation of the barrage and its as

Project Information FAQ

Project Information

5 Q
The project “PK-Sindh Barrages Improvement Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Pakistan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objectives of the Sindh Barrages Improvement Project for Pakistan are to improve the reliability and safety of the Guddu barrage and strengthen the Sindh Irrigation Department’s capacity to operate and manage the barrage. There are three components to the project, the first component being rehabilitation of the Guddu barrage. This component will support rehabilitation of the barrage and its associated structures. The component will finance: concrete repairs along the upstream gate grooves and rehabilitation of both fish ladders; removal of the left pocket dividing wall and construction of a new left pocket dividing wall to widen the left pocket and improve its ability to reduce the quantities of sediment entering the Ghotki feeder canal; and river training works through construction of a left-bank spur to promote favorable river approach conditions to the barrage and strengthen the upstream existing river training works. The second component is the improved barrage operation. This component will support the establishment of the BMO and modernization and improvements to the barrage O&M. Institutionally this will include undertaking a study to design the BMO structure, defining roles and responsibilities, and moving towards a more service oriented culture. Technically the Bank will finance necessary upgrades to the monitoring instrumentation, such as piezometers, gate positioning and water measurement equipment, replacement of surveillance and maintenance boats, and procurement of hydrographic equipment. The project will support workshops and provide a stock of spare parts, for use in maintenance activities. The instrument monitoring system for the barrage will be renovated, and the operations staff will be equipped with an updated operation, maintenance, and surveillance manual. Finally, the third component is the project management, monitoring, and evaluation. This component will support the coordination of all project-related activities as well as training and technical assistance in procurement, financial, social and environmental safeguards, and communication. This component will also finance the independent Panel of Experts (POE), who will review, monitor, evaluate, and help guide the rehabilitation process with regards to the safety of the barrage.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data