PL Gold Mine Grid Power Connection and Distribution Upgrade
Sector: Hydro • Location: Manitoba, Canada
Source: TMX Newsfile
Minnova Corp. has engaged Amps Powerline Inc. to oversee the reconnection and energization of the PL Gold Mine site to the Manitoba Hydro grid using existing power line infrastructure, as well as the refurbishment of the site's power distribution and electrical systems for the crushing and processing plant. This is part of advancing the PL Gold Mine towards production with planned Preliminary Econ
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT)
- Location
- Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- TMX Newsfile
ConstructChat
Ask ConstructChat about PL Gold Mine Grid Power Connection and Distribution Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Minnova Corp. has engaged Amps Powerline Inc. to oversee the reconnection and energization of the PL Gold Mine site to the Manitoba Hydro grid using existing power line infrastructure, as well as the refurbishment of the site's power distribution and electrical systems for the crushing and processing plant. This is part of advancing the PL Gold Mine towards production with planned Preliminary Economic Assessment and updated Feasibility Studies in 2026. |
Original sector | Mining |
Location
Country | Canada |
State | Manitoba |
Source
Source | TMX Newsfile |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT) |
Article published date | 2025-12-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent