PL Offshore Wind
One of 10,000+ projects Taiyo tracks in Poland.
Source: International Finance Corporation (IFC)
IFC is considering two senior loans to support the development, construction, and operation of two offshore windfarms (Baltyk II and Baltyk III) that are being developed through a Joint Venture between Equinor Wind Power and Polenergia S.A. (the “Projects”). Each of the two offshore wind power projects will comprise 50 wind turbines (i.e., 100 in total), an offshore substation and inter-array cabl
- Status
- Closed
- Sector
- Road, Wind, Telecommunications, Government, Power Generation (CCGT)
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about PL Offshore Wind
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | hold |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | IFC is considering two senior loans to support the development, construction, and operation of two offshore windfarms (Baltyk II and Baltyk III) that are being developed through a Joint Venture between Equinor Wind Power and Polenergia S.A. (the “Projects”). Each of the two offshore wind power projects will comprise 50 wind turbines (i.e., 100 in total), an offshore substation and inter-array cabling, and will have an installed capacity of 720MW (1.44GW in total). Both projects will be located within the Polish Economic Exclusive Zone (EEZ), with Baltyk II covering an area of 122km2 located approximately 37km offshore and Baltyk II covering 117km2 located approximately 22km offshore. Two independent External Connection Infrastructure (ECI) systems will be constructed, one for each of the two projects, comprising 60km and 67km of offshore cable lines for Baltyk II and III respectively, and 14 km of parallel onshore underground cabling, and an onshore substation, for each of the projects. The majority of the offshore ECI will be within the Polish EEZ, with the nearshore sections being in territorial waters, and the onshore sections located within the municipalities of Utska and Redsiko in the Pomosrkie voivodship. Facilities are currently being developed at the port of Leba, approximately 100 km west of Gdansk to serve as the operations and maintenance base for the projects and have therefore been considered as an associated facility. Additional temporary project infrastructure during construction will include workers accommodation, compounds, storage areas, site access roads, tracks etc. |
Original sector | V-BC - Wind Power - Renewable Energy Generation |
Location
Country | Poland |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Road, Wind, Telecommunications, Government, Power Generation (CCGT) |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Poland
- Golice Wind Park
- Design and build of 18.2 km on the S19 highway between Dukla and Barwinek (Poland)
- Design and construction of 18.1 km of the S19 highway between Radzyn and Podlaski (Poland)
- Design and construction of the third section of the A2 over 12 km in the Mińsk Mazowiecki bypass (Poland)
- Cadbury Schweppes Confectionery Factory, Skarbimierz
- Design and construction of 17 km of S3 express road Swinoujscie-Tronszyn in the section between Swinoulscie-Dargobadz (Poland)
- Design and construction of 19.46 km of the S-61 highway between Prodborze and Sniadowo (Poland)
- Design and construction of 6,67 km of the S-7 highway between Plotnisko and Lesznowola (Poland)
