logo

Plan PAZcifico Continuity: Water, Sanitation and Waterway Connectivity Project

Sector: Water Supply and Storage • Location: Colombia

Source: World Bank Group

Project
Pipeline

The proposed Project extends the Bank’s continued support to the provision of potable water, sanitation and transport connectivity services in the Pacific region of Colombia. It will complete and operationalize the infrastructure originally envisioned under the Water Supply and Basic Sanitation Infrastructure and Service Delivery Project (P156239) and the Enhancing Waterway Connectivity and Water

Project Information FAQ

Project Information

4 Q
The project “Plan PAZcifico Continuity: Water, Sanitation and Waterway Connectivity Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pipeline

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed Project extends the Bank’s continued support to the provision of potable water, sanitation and transport connectivity services in the Pacific region of Colombia. It will complete and operationalize the infrastructure originally envisioned under the Water Supply and Basic Sanitation Infrastructure and Service Delivery Project (P156239) and the Enhancing Waterway Connectivity and Water Service Provision in Colombia’s Plan PAZcifico Project (P156880). By carrying forward and finalizing these investments, the proposed Project aims to convert partial progress into sustained service delivery outcomes for water, sanitation and transport connectivity in one of Colombia’s most underserved regions, while addressing the bottlenecks that have slowed execution to date. Project implementation will build upon the experience and lessons learned from the FTSP during the execution of the original water and connectivity operations. The MIE, as implementing agency, has established a PIU for project management, fiduciary tasks, reporting, and environmental and social management. Project components include: Component 1: Water supply and sanitation improvement. This component supports expanding and upgrading potable water and sanitation services in urban areas with low coverage. Investments include water intake, treatment, distribution, metering, and sanitation infrastructure to reduce health and environmental risks. It also addresses solid waste management, strengthens the technical, administrative, and operational capacities of the entities responsible for service provision and regulation, and promotes the responsible use and sustainability of water and sanitation systems by the community.Component 2: River and river-maritime transport improvement. This component finances the design, construction, and maintenance of resilient and accessible river and maritime docks, including floating structures. It supports climate-resilient infrastructure, low-emission electric boats, and navigation aids to enhance safety and connectivity. Additionally, it includes capacity building and institutional strengthening, fostering the creation of community-based associations and providing training for transport service providers.Component 3: Project management and environmental and social management. This component provides support for project implementation, including financial management, procurement, disbursement, and the design and execution of environmental and social instruments, as well as operating costs and audits.Component 4: Contingent Emergency Response Component (CERC) establishes a mechanism for rapid access to financing in response to eligible crises or emergencies, enabling the reallocation of funds to address major adverse impacts from natural or man-made disasters.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data