Plant A and Former Trash Transfer Station Remediation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project involves remediating Plant A and the former Trash Transfer Station by placing an engineering control consisting of a Geo textile fabric and one (1) foot of clean fill within the open area. The perimeter fence will also be removed and replaced as needed. Cracks in the pavement will be sealed in addition to curbing being installed to contain the engineering controls. This project also c
- Status
- Prospective
- Sector
- Car parking, Manufacturing (Industrial), Road, Automotive, Government, Commercial, Hospital, Hotel
- Location
- Fort Lauderdale, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Plant A and Former Trash Transfer Station Remediation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves remediating Plant A and the former Trash Transfer Station by placing an engineering control consisting of a Geo textile fabric and one (1) foot of clean fill within the open area. The perimeter fence will also be removed and replaced as needed. Cracks in the pavement will be sealed in addition to curbing being installed to contain the engineering controls. This project also contains several options which may or not be included depending on costs, including the removal of... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Fort Lauderdale |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Manufacturing (Industrial), Road, Automotive, Government, Commercial, Hospital, Hotel |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
