logo

Plant Bowen Combined Cycle Natural Gas Units and Battery Energy Storage Systems

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Coosa Valley News

Project
Proposed

At Plant Bowen in Bartow County, Georgia Power is proposing two new combined cycle natural gas units with a total capacity of 1,482 MW as part of a statewide plan to add 3,692 MW of new natural gas capacity. Additionally, two new Battery Energy Storage Systems (BESS) installations (Bowen Phases 1 & 2) totaling 500 MW will be added to enhance grid stability by storing energy during off-peak times f

Status
Prospective
Sector
Energy Storage, Power Generation (CCGT), Natural Gas
Location
Bartow, Georgia, United States of America
Updated
22 Jul 2026
Source
Coosa Valley News

ConstructChat

Ask ConstructChat about Plant Bowen Combined Cycle Natural Gas Units and Battery Energy Storage Systems

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Plant Bowen Combined Cycle Natural Gas Units and Battery Energy Storage Systems” is an infrastructure initiative in the Energy Storage sector, located in Bartow, Georgia, United States. Taiyo aggregates data on it from Coosa Valley News.

Participants

Not available for this record.

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

At Plant Bowen in Bartow County, Georgia Power is proposing two new combined cycle natural gas units with a total capacity of 1,482 MW as part of a statewide plan to add 3,692 MW of new natural gas capacity. Additionally, two new Battery Energy Storage Systems (BESS) installations (Bowen Phases 1 & 2) totaling 500 MW will be added to enhance grid stability by storing energy during off-peak times for use during high-demand periods.

Original sector

Energy

Location

Country

United States of America (USA)

State

Georgia

City

Bartow

Source

Source

Coosa Valley News

URL

More Details

Record type

Project

Sector

Energy Storage, Power Generation (CCGT), Natural Gas

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project