Plant Control System I/O Replacement Phase 3
Bidding · California · Last reported Jul 2024
Source: Dodge USA
The work generally consists of replacing a 1000-hp variable frequency drive for Final Effluent Pump 3, three remote I/O control panels, aeration turbine vibration systems, rewiring motor control center controls and installing associated conduit and wire. The estimated cost of construction is $1,500,000. Central San, at its discretion, may add additional construction activities after Award of the C
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Wind, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage
- Location
- Martinez, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Plant Control System I/O Replacement Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work generally consists of replacing a 1000-hp variable frequency drive for Final Effluent Pump 3, three remote I/O control panels, aeration turbine vibration systems, rewiring motor control center controls and installing associated conduit and wire. The estimated cost of construction is $1,500,000. Central San, at its discretion, may add additional construction activities after Award of the Construction Contract. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Martinez |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Wind, Government, Commercial, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-07-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
