logo
ProjectClosed

Plant Control System I/O Replacement Phase 3

Closed · California · Last reported Nov 2024

Source: Dodge USA

The work generally consists of replacing a 1000-hp variable frequency drive for Final Effluent Pump 3, three remote I/O control panels, aeration turbine vibration systems, rewiring motor control center controls and installing associated conduit and wire. The estimated cost of construction is $1,500,000. Central San, at its discretion, may add additional construction activities after Award of the C

Status
Closed
Sector
Water Supply and Storage, Commercial, Waste Processing and Treatment, Wind, Government, Manufacturing (Industrial)
Location
Martinez, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Plant Control System I/O Replacement Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Plant Control System I/O Replacement Phase 3” is an infrastructure initiative in the Water Supply and Storage sector, located in Martinez, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work generally consists of replacing a 1000-hp variable frequency drive for Final Effluent Pump 3, three remote I/O control panels, aeration turbine vibration systems, rewiring motor control center controls and installing associated conduit and wire. The estimated cost of construction is $1,500,000. Central San, at its discretion, may add additional construction activities after Award of the Construction Contract.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Martinez

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Waste Processing and Treatment, Wind, Government, Manufacturing (Industrial)

Article published date

2024-11-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project