logo

Plata Toll Road (A-66)

Sector: Automotive • Location: Castilla y Leon, Spain

Source: Ferrovial

Project
Close

Ferrovial Business Lines Projects Plata Toll road (A-66) Zamora, Spain $189.7M Investment 49km Of Length 2012-2042 Concession period 2015 Opening date Running for close to 800 km, this motorway connects the cities of Gijón and Seville. Ferrovial Construction has carried out successive projects on the Autovía de la Plata motorway: the stretches between Plasencia and Cañaveral, in the province of

Project Information FAQ

Project Information

5 Q
The project “Plata Toll Road (A-66)” is an infrastructure initiative in the Automotive sector, located in Castilla y Leon, Spain. Taiyo aggregates data on it from Ferrovial.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial Business Lines Projects Plata Toll road (A-66) Zamora, Spain $189.7M Investment 49km Of Length 2012-2042 Concession period 2015 Opening date Running for close to 800 km, this motorway connects the cities of Gijón and Seville. Ferrovial Construction has carried out successive projects on the Autovía de la Plata motorway: the stretches between Plasencia and Cañaveral, in the province of Cáceres; at El Ronquillo (Seville) on the border with the province of Huelva; the Guijuelo to Sorihuela stretch in Salamanca; and the stretch running between Benavente and Zamora which completes the motorway project. The Benavente to Zamora stretch, opened in 2015, is 49 km long and has a total of 54 pieces of infrastructure: 5 viaducts, 34 overhead passes, and 15 underpasses. The highway has an assistance service for incidents 24 hours a day, in addition to having two rest areas and a service area equipped for refueling, shopping and restaurant options. This stretch completes a project which has been over 10 years in the making and crosses the Iberian Peninsula from north to south, connecting the cities of Gijón and Seville via the west of the country. This new road carries an average of 7,000 vehicles per day, providing safer driving conditions and shorter journey times. Environmental measures to minimise impact include the provision of numerous animal crossings, the restoration of traditional cattle trails, recovery of vegetation on embankments through the provision of topsoil, hydroseeding and planting, and installation of noise barriers near residential areas. An infrastructure managed under the commitment to Quality, Environment and Road Safety, ratified by the certifications according to the UNE ISO-9001, ISO-14001 and ISO-39001 standards.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data