Plateaus of Guadalupe/PI
Sector: Hydro • Location: Piauí, Brazil
Source: Brazil PPI
The Platôs de Guadalupe Public Irrigation Perimeter, located in the municipality of Guadalupe, in the central-western region of the State of Piauí, on the banks of the Boa Esperança Dam reservoir, 360 km from Teresina, was qualified under the Partnership Program for PPI investments, together with 6 other hydro-agricultural and irrigation projects, through Resolution No. 216, of December 16, 2021,
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Platôs de Guadalupe Public Irrigation Perimeter, located in the municipality of Guadalupe, in the central-western region of the State of Piauí, on the banks of the Boa Esperança Dam reservoir, 360 km from Teresina, was qualified under the Partnership Program for PPI investments, together with 6 other hydro-agricultural and irrigation projects, through Resolution No. 216, of December 16, 2021, endorsed by Decree No. 11,041, of April 12, 2022. The Project has the potential to irrigate 13,434 hectares, by capturing water directly from the lake at the Boa Esperança Dam, on the Parnaíba River. Of this total, 3,196 correspond to the 1st Stage of the project, which is already in operation. For the 2nd Stage, the agricultural exploitation of 10,238 hectares is planned. Access to the project area is mainly via the BR-343 highway, which connects Teresina to Floriano. The 2nd Stage will share part of the collective irrigation infrastructure that is implemented and in operation, serving the 1st Stage of the project, including the approach canal, the EBP-Sul, the main pipeline, the main canal 2 and the buffer reservoir. Collection infrastructure, conduction channels, secondary pumping station, pressurization station, water intake and distribution systems, drainage system and road system must be implemented. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
