Play Surface Replacement and Site Improvements REBID
Sector: Car parking • Location: Sunnyvale, California, United States of America
Source: Dodge USA
. The Project consists of: Cumberland ES 824 Cumberland Dr., Sunnyvale, CA 94087 Play surface replacement from resilient tiles to synthetic turf at two (2) elementary playgrounds. School marquee replacement with an electronic type Lakewood ES 750 Lakechime Drive, Sunnyvale, CA 94089 Play surface replacement from resilient tiles to synthetic turf at two (2) elementary playgrounds. School marquee re
- Status
- Closed
- Sector
- Car parking, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Sunnyvale, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Play Surface Replacement and Site Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | . The Project consists of: Cumberland ES 824 Cumberland Dr., Sunnyvale, CA 94087 Play surface replacement from resilient tiles to synthetic turf at two (2) elementary playgrounds. School marquee replacement with an electronic type Lakewood ES 750 Lakechime Drive, Sunnyvale, CA 94089 Play surface replacement from resilient tiles to synthetic turf at two (2) elementary playgrounds. School marquee replacement with an electronic type San Miguel ES 777 San Miguel Avenue, Sunnyvale, CA 94087 Play s... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Sunnyvale |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
