PLAYAS POWER
Sector: Water Supply and Storage • Location: Colombia
Source: World Bank Group
The project would provide additional power and capacity to the national system, thereby making hydro-based energy available in the North Atlantic region which now depends entirely upon thermal generation. The project consists of: (a) a 65-meter earthfill dam with a volume of about 1.9 million cubic m, including a spillway with a 2,800 cubic m/sec discharge capacity, tunnels and underground penstoc
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Geothermal, Government, Hydro
- Location
- Colombia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about PLAYAS POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would provide additional power and capacity to the national system, thereby making hydro-based energy available in the North Atlantic region which now depends entirely upon thermal generation. The project consists of: (a) a 65-meter earthfill dam with a volume of about 1.9 million cubic m, including a spillway with a 2,800 cubic m/sec discharge capacity, tunnels and underground penstock; (b) a 200 MW underground power station with three Francis turbines and three generators of 67 MW each; (c) a substation and 1 km of 230-kV transmission line to link with the San Carlos-Guatape line; and (d) studies to: (i) assist in determining actions necessary to ensure adequate environmental protection of the Playas reservoir; (ii) provide a least-cost plan for power rationing in the event of need; and (iii) determine the feasibility of EPM's acquiring the Electrificadoras of Antioquia and Choco, and to assess the works needed to bring their systems up to adequate standards. Tariff measures provided for under the project would continue to support the Government's objective of sound sector financing. Furthermore, the above mentioned study of the Electrificadoras would complement recent Government initiatives to strengthen sector organization and efficiency. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Colombia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Geothermal, Government, Hydro |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
