logo

Playground Bathroom Building Construction

Sector: Commercial • Location: Chattanooga, Tennessee, United States of America

Source: Dodge USA

Project
Closed

Scope of Work: Construct a 12x10 cut phase block building with 1 unisex ADA bathroom with a pipe chase and 120ft of sidewalk. The contractor will be required to obtain all required building permits from the city, and all building fees will be waived. 12x10 cut phase block building. 1 bathroom to meet all ADA requirements and 1 pipe chase behind the bathroom. Both doors should be keyed the same. Th

Status
Closed
Sector
Commercial, Cement, Car parking, Automotive, Government, Manufacturing (Industrial)
Location
Chattanooga, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Playground Bathroom Building Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Playground Bathroom Building Construction” is an infrastructure initiative in the Commercial sector, located in Chattanooga, Tennessee, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Scope of Work: Construct a 12x10 cut phase block building with 1 unisex ADA bathroom with a pipe chase and 120ft of sidewalk. The contractor will be required to obtain all required building permits from the city, and all building fees will be waived. 12x10 cut phase block building. 1 bathroom to meet all ADA requirements and 1 pipe chase behind the bathroom. Both doors should be keyed the same. The concrete slab should be 18x14 level with the playground grade, with a 4ft overhang on the left ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Chattanooga

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Cement, Car parking, Automotive, Government, Manufacturing (Industrial)

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project