Playground Equipment and Fall Surface Upgrades
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Provide 2 Playground Equipment and /or Seating and Shade structure design choices with itemized prices for each of the following: Audubon ES Approximately 2,400 SF artificial turf and padding Remove shed and fencing between the two playground sections and grade as a slope instead of a step/etc. Create a bike track area on the playground, on the upper section, but we'd need to look at making sure s
- Status
- Closed
- Sector
- Car parking, Education, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Colorado Springs, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Playground Equipment and Fall Surface Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Provide 2 Playground Equipment and /or Seating and Shade structure design choices with itemized prices for each of the following: Audubon ES Approximately 2,400 SF artificial turf and padding Remove shed and fencing between the two playground sections and grade as a slope instead of a step/etc. Create a bike track area on the playground, on the upper section, but we'd need to look at making sure students wouldn't accidentally ride the bikes down the slope. Add play equipment to existing layou... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Colorado Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Education, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
