Plaza Improvements
Sector: Commercial • Location: East Hazel Crest, Illinois, United States of America
Source: Dodge USA
The scope of the work shall consist of but is not limited to ramp pavement and shoulder replacement, removal of the existing toll plaza median island, equipment, and canopy, construction of proposed barrier wall extensions, construction of toll plaza monotube, toll plaza electrical work, lighting, pavement marking, signing improvements, landscaping, erosion and sediment control, and maintenance of
- Status
- Closed
- Sector
- Commercial, Power Generation (CCGT), Road
- Location
- East Hazel Crest, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Plaza Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of the work shall consist of but is not limited to ramp pavement and shoulder replacement, removal of the existing toll plaza median island, equipment, and canopy, construction of proposed barrier wall extensions, construction of toll plaza monotube, toll plaza electrical work, lighting, pavement marking, signing improvements, landscaping, erosion and sediment control, and maintenance of traffic. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | East Hazel Crest |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Road |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
