Pleasant Grove Blvd. Interchange Improvements
One of 10,000+ projects Taiyo tracks in Utah.
Source: Utah Department of Transportation (UDOT)
The Environmental Assessment (EA) is now available for public review and comment. The document was prepared in accordance with the National Environmental Policy Act (NEPA) and is being conducted to evaluate transportation solutions for the I-15 Pleasant Grove Boulevard interchange and the surrounding area in Pleasant Grove and Lindon.
- Status
- Prospective
- Sector
- Government
- Location
- Pleasant Grove, Utah, United States of America
- Updated
- 19 Nov 2026
- Source
- Utah Department of Transportation (UDOT)
ConstructChat
Ask ConstructChat about Pleasant Grove Blvd. Interchange Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | studies |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Environmental Assessment (EA) is now available for public review and comment. The document was prepared in accordance with the National Environmental Policy Act (NEPA) and is being conducted to evaluate transportation solutions for the I-15 Pleasant Grove Boulevard interchange and the surrounding area in Pleasant Grove and Lindon. |
Location
Country | United States of America (USA) |
State | Utah |
City | Pleasant Grove |
Source
Source | Utah Department of Transportation (UDOT) |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
