PLEASANT HILL NEIGHBORHOOD IMPROVEMENTS - PHASE IB
Sector: Road • Location: Macon, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Phase 1B consists of mitigation improvements to the Pleasant Hill Neighborhood on each side of the I-75 corridor from milepost 164.12 to 164.60 for a distance of 0.48 miles. The mitigation items include the following construction improvements.Covering of an existing concrete drainage channel between First Avenue and WalnutStreet and conversion to a 1700’ long triple barrel box culvert.A linear p
- Status
- Closed
- Sector
- Road, Cement, Car parking, Waste Processing and Treatment, Automotive, Government
- Location
- Macon, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about PLEASANT HILL NEIGHBORHOOD IMPROVEMENTS - PHASE IB
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 1B consists of mitigation improvements to the Pleasant Hill Neighborhood on each side of the I-75 corridor from milepost 164.12 to 164.60 for a distance of 0.48 miles. The mitigation items include the following construction improvements.Covering of an existing concrete drainage channel between First Avenue and WalnutStreet and conversion to a 1700’ long triple barrel box culvert.A linear park with 10-ft trail along I-75 in the area bounded by the interstate, First Avenue, Walnut Street, and the former drainage channel. Closure of Middle St. from First Ave. to Fourth Ave. and extension of Middle St. from Fifth Ave. to Walnut St.Re-surfacing of First Ave. and Second Ave. on the west side of I-75.Closure of Frontage Rd. between First and Second Ave. to be used as greenspace for access to the pedestrian bridge.Cul-de-sacs at Second and Fourth Ave. on the east side of I-75 and on Craft St. on thewest side of I-75. ¿ |
Location
Country | United States of America (USA) |
State | Georgia |
City | Macon |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Car parking, Waste Processing and Treatment, Automotive, Government |
Article published date | 2025-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
