PLEASANT HILL NEIGHBORHOOD IMPROVEMENTS - PHASE IB
Sector: Cement • Location: Macon, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Phase 1B consists of mitigation improvements to the Pleasant Hill Neighborhood on each side of the I-75 corridor from milepost 164.12 to 164.60 for a distance of 0.48 miles. The mitigation items include the following construction improvements.Covering of an existing concrete drainage channel between First Avenue and WalnutStreet and conversion to a 1700’ long triple barrel box culvert.A linear p
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Phase 1B consists of mitigation improvements to the Pleasant Hill Neighborhood on each side of the I-75 corridor from milepost 164.12 to 164.60 for a distance of 0.48 miles. The mitigation items include the following construction improvements.Covering of an existing concrete drainage channel between First Avenue and WalnutStreet and conversion to a 1700’ long triple barrel box culvert.A linear park with 10-ft trail along I-75 in the area bounded by the interstate, First Avenue, Walnut Street, and the former drainage channel. Closure of Middle St. from First Ave. to Fourth Ave. and extension of Middle St. from Fifth Ave. to Walnut St.Re-surfacing of First Ave. and Second Ave. on the west side of I-75.Closure of Frontage Rd. between First and Second Ave. to be used as greenspace for access to the pedestrian bridge.Cul-de-sacs at Second and Fourth Ave. on the east side of I-75 and on Craft St. on thewest side of I-75. ¿ |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
