logo
ProjectSigned

PLK RAILWAY MODERNISATION E59 PHASE 3

The status, timeline and source of this project. A free account opens every field.

Source: European Investment Bank (EIB)

The project consists of the modernisation of approximately 71km of mainline track between Czempin and Rawicz, which is part of the Poznan – Wroclaw line and of the European Rail Corridor E59. The section is located on the core TEN-T rail network.

Status
Under Construction
Sector
Mass Transit, Rail, Government
Location
Poland
Updated
22 Jul 2026
Source
European Investment Bank (EIB)

ConstructChat

Ask ConstructChat about PLK RAILWAY MODERNISATION E59 PHASE 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “PLK RAILWAY MODERNISATION E59 PHASE 3” is an infrastructure initiative in the Mass Transit sector, located in Poland. Taiyo aggregates data on it from European Investment Bank (EIB).

Participants

Sponsoring Agency

Status

Original status

signed

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of the modernisation of approximately 71km of mainline track between Czempin and Rawicz, which is part of the Poznan – Wroclaw line and of the European Rail Corridor E59. The section is located on the core TEN-T rail network.

Original sector

Transport

Location

Country

Poland

Source

Source

European Investment Bank (EIB)

URL

More Details

Record type

Project

Sector

Mass Transit, Rail, Government

Article published date

2025-07-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project