PLK WARSAW RADOM
One of 10,000+ projects Taiyo tracks in Poland.
Source: European Investment Bank (EIB)
The project consists of the modernisation of the entire railway line from Warsaw (Okecie, km 11.800) via Warka (km 56.444) to Radom (km 102.944). The line now allows for maximum travel speed of 80 km/h. At certain bridges the speed has to be reduced to 10 km/h.
- Status
- Under Construction
- Sector
- Mass Transit, Rail, Power Generation (CCGT), Government
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about PLK WARSAW RADOM
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the modernisation of the entire railway line from Warsaw (Okecie, km 11.800) via Warka (km 56.444) to Radom (km 102.944). The line now allows for maximum travel speed of 80 km/h. At certain bridges the speed has to be reduced to 10 km/h. |
Original sector | Transport |
Location
Country | Poland |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Power Generation (CCGT), Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
