logo

Plough Centre for Sterile Drug Delivery Systems, Memphis

Sector: Commercial • Location: United States

Source: Pharmaceutical Technology

Project
Closed

Construction of a drug manufacturing facility for the University of Tennessee Health Science Centre in Memphis, Tennessee, is expected to begin in September 2015. Memphis, Tennessee September 2015 2017 $16m G-CON Manufacturing Sales Engineering, brg3s Architects, ETFC Architects, DPS Consulting, DPS Engineering Construction of a drug manufacturing facility for the University of Tennessee Health Sc

Project Information FAQ

Project Information

5 Q
The project “Plough Centre for Sterile Drug Delivery Systems, Memphis” is an infrastructure initiative in the Commercial sector, located in United States. Taiyo aggregates data on it from Pharmaceutical Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Construction of a drug manufacturing facility for the University of Tennessee Health Science Centre in Memphis, Tennessee, is expected to begin in September 2015. Memphis, Tennessee September 2015 2017 $16m G-CON Manufacturing Sales Engineering, brg3s Architects, ETFC Architects, DPS Consulting, DPS Engineering Construction of a drug manufacturing facility for the University of Tennessee Health Science Centre in Memphis, Tennessee, is expected to begin in September 2015. The facility will be known as the Plough Centre for Sterile Drug Delivery Systems. The facility will house pre-manufactured cleanroom pods for the manufacture and filling of clinical trial drugs. It will provide aseptic formulation and clinical trial drug compounding services on a contractual basis for the private sector. It will be built in compliance with current good manufacturing practices (cGMP) to produce small-batch drugs in injectable and semi-solid dosage forms for pre-clinical Phase I and II clinical trials. The facility will be built by replacing the 32,000ft² warehouse on South Dudley Street, which was bought from Dudley Properties for $750,000 in June 2011. The University of Tennessee filed a $3.7m permit application for the project with the Shelby County Department of Construction Code Enforcement in July 2015. The sterile drug delivery systems facility will have a 32,000ft² total floor space, 17,200ft² of which will be given to pre-fabricated sterile pods. It will also include three 800ft² pre-fabricated pods to serve as sterile environments for aseptic pharmaceutical manufacturing. Pre-fabricated pods will include temperature-controlled and smaller spaces to give control over sterilisation while preparing, compounding and filling pharmaceuticals at a small scale. A total of 10,000ft² of floor space will support labs, offices and training facilities. The facility will manufacture orphan drugs developed to treat specific and rare diseases, as well as innovative drug delivery systems. It will provide training to students and professionals from the pharmaceutical industry, as well as government regulatory agencies in production. The two blocks in operation are dedicated to the manufacturing of cephalosporins and general injectables. Construction of the facility is expected to begin in September 2015 and is intended to be complete within 24 months. It will include renovating the old warehouse, refurbishing the building’s interior and updating its exterior. In March 2015, G-CON Manufacturing Sales Engineering was contracted to build a multi-pod ISO Class 7 formulation and filling suite for the facility. The project team includes brg3s Architects, ETFC Architects, DPS Consulting and DPS Engineering. DPS Consulting will provide pharmaceutical consulting and guidance, while DPS Engineering will provide process architecture and design for the pods. The facility will be built with an estimated investment of $16m. Plough Foundation has contributed $4.5m towards its construction. Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data