Plovdiv Road Rehabilitation Project

Sector: Road • Location: Bulgaria

Source: European Bank for Reconstruction and Development (EBRD)

Project
Cancelled

Translated version of this PSD: Bulgarian The EBRD is considering a loan of up to EUR 15 million (or Bulgarian Leva equivalent of BGN 29.3 million) to the City of Plovdiv to assist with its Urban Transport Reform Programme. The loan proceeds will be used to finance road rehabilitation works and includes the following components: (i) Priority rehabilitation works on approximately 105km of secondary

Project Information FAQ

Project Information

4 Q
The project “Plovdiv Road Rehabilitation Project” is an infrastructure initiative in the Road sector, located in Bulgaria. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Translated version of this PSD: Bulgarian The EBRD is considering a loan of up to EUR 15 million (or Bulgarian Leva equivalent of BGN 29.3 million) to the City of Plovdiv to assist with its Urban Transport Reform Programme. The loan proceeds will be used to finance road rehabilitation works and includes the following components: (i) Priority rehabilitation works on approximately 105km of secondary and local roads as selected in accordance with economic and technical selection criteria; (ii) Consultancy services related to design and procurement of multi-year Performance-Based Management and Maintenance of Roads (PMMR) contracts. The following transition impact is expected to be achieved: 1) Framework for markets In contrast to a system in which road maintenance is carried out on unit-cost (or input-based), single segment basis leading to a certain instability in funding levels year on year, and thus over time to a road network in poor condition, output-based outsourcing of road/street maintenance, i.e. PMMR, will be developed to achieve better value for money. The PMMR approach is centred around the concept of pre-determining road serviceability standards based on performance levels (e.g., smoothness of surfaces, cleanliness of drainage systems, condition and appearance of signage, etc.). These performance standards are then tendered for with private sector contractors who compete during tendering for long-term maintenance contracts using fixed costs per kilometre of maintenance, with full payments made only for full compliance with the pre-established road maintenance service standards. Initially the PMMR approach will be introduced on a pilot basis for a minimum of 15 km of city roads and will come under joint rehabilitation-PMMR contracting. 2) Transfer of skills The technical assistance for the development, preparation, training needs and implementation of the PMMR contracting, will lead to a transfer of skills to the City’s staff employed at the department responsible for design, execution and management of the road network in the City. Furthermore, specific training modules will be included in the TORs for both the road contractor industry and through active and sustained day-to-day activities working alongside the consultant teams on the PMMR contracting and project management and supervision. 3) Improved Road Management and Planning The Bank will mobilise TC funds to the City to strengthen its administration by bolstering the existing Traffic Department to plan and manage rehabilitation works to international standards, combined with PMMR-based road maintenance contracts to protect valuable assets. 4) Demonstration effect By reforming the urban road network and its administration in Bulgaria's second largest town, the Project will provide an important demonstration effect to other Bulgarian cities. The Project will demonstrate the benefits of adequate road sector finance, enabling the transport administration to apply more efficient methods for meeting road transport needs. Generally, through the Plovdiv example, other municipalities in the country will be able to see the benefits of reforms to the urban road system, including the introduction of sustainable financing and performance-based contracting for road maintenance. The city of Plovdiv. Loan of up to €15 million. € 17.3 million Categorised B in accordance with the EBRD's 2008 Environmental and Social Policy. An environmental and social analysis of the project was undertaken by independent consultants. The investigations showed that the Project will provide environmental and social benefits related to the reduction of congestion and air emissions as well as improvements in road and pedestrian safety in the City of Plovdiv. The due diligence has confirmed that there are no significant adverse environmental or social impacts or issues associated with the Project. Bulgarian competent authorities (REWI Plovdiv) have carried out an environmental screening procedure in accordance with the requirements of the EU EIA Directive and concluded that an EIA is not required. The road rehabilitation works will be taking place predominantly in the urban environment and no Natura 2000 sites will be affected. There will be localised moderate impacts during the road improvement works related to noise and dust, generation and disposal of waste and temporary traffic restrictions. These will be mitigated by good construction practices and through agreed mitigation, monitoring and stakeholder engagement measures. The due diligence also identified that the client's E&S management and organisational capacity needs further improvements, and Plovdiv Municipality will further develop and implement environmental and quality management systems to be certified according to ISO 14001 and ISO 9001 standards. A time bound Environmental and Social Action Plan (ESAP) has also been prepared for the Project based on the results of the due diligence, outlining potential improvement opportunities and mitigation measures to avoid, minimise or mitigate any adverse impacts arising from the project implementation. In particular, the ESAP covers (i) project planning activities including the development of the specific EHS procedures for construction stage and staff (internal and subcontractors) training on implementation of those; (ii) corporate environmental and social issues, including finalisation and implementation of Stakeholder Engagement Plan (SEP) and grievance mechanism for internal and external stakeholders; (iii) construction phase activities, including appropriate EHS procedures for contractors and EHS supervision of the works, procedures for chance finds, prevention of dust and noise impacts, and implementing specific actions to ensure community health and safety issues; (iv) operation phase issues, including environmental monitoring activities. A Stakeholder Engagement Plan, including a grievance mechanism, has been prepared for the project. As part of the SEP, a summary of the project's impacts and mitigation measures will be disclosed locally before construction works start. The Bank will monitor the implementation of the Project, ESAP, SEP and E&S monitoring plan. Pre-Signing Post-Signing

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data